|
Another VC, who'd have thought it?
Being a two man layout, more systems have been covered on this model. Fuel, electrics, hydraulics, air conditioning systems, pressurization and a working APU.
All the extra equipment will be ready to go when loaded into FS, so you can still jump in and fly. For a 'cold start' there is a button that can turn off everything.
The updated BAC 1-11 should be available before Christmas.
|
|
|
|